THE WORKS FOR ENERGY POWER PLANTS

 

Marine Site Survey of Cooling System of Ambarli 1350 MW. Natural Gas Combined Power Plant. (1988)

GEOMARIN INC. & GEOTEKNIK INC. & IMST.,

For TURKISH ELECTRICITY BOARD (T.E.K.), ANKARA

 

Offshore Surveying Works on the Aliağa Thermal Power Station Project, Aegean Sea. (1989)

GEOMARIN INC. & GEOTEKNIK INC.,

 For ELECTRIC POWER DEVELOPMENT CO. LTD., TOKYO - JAPAN.

 

Bathymetric Survey and Related Works for the Marmara Ereğli'si, Natural Gas Combined Cycle Power Plant 480 MW, (1994)

GEOMARIN INC. & PIRI REIS CO. LTD

For ABB. AG.

 

Marine Survey for Iskenderun (Sugozu) Thermic Power Plant  (2000)

PIRI REIS CO. LTD &GEOMARIN INC.

For GAMA-TEKFEN Joint Venture

 

Additional Measurements for sea level, wind speed and directions for Iskenderun (Sugozu) Thermic Power Plant (2001)

PIRI REIS CO. LTD. &GEOMARIN INC.

For ISKEN INC.

 

“Bathymetry, Seismic Survey and Geotechnical Works” for Baku-Ceyhan Crude Oil Pipeline Project, Ceyhan Marine Terminal Offshore Construction Works, (2003)

PIRI REIS CO. LTD. &GEOMARIN INC.

For TEKFEN INC as Contractors to BOTAS

 

Nemrut Termik Santrali Projesi kapsamındaki Batimetri, Hidrografi ve Soğutma Suyu Geri Deşarjı Hidrolik Deniz Araştırmaları (2008)

PİRİ REİS CO. LTD.

İşveren: İZDEMİR Enerji Elektrik Üretim A.Ş.

 

 